This is default featured slide 1 title

Go to Blogger edit html and find these sentences.Now replace these sentences with your own descriptions.This theme is Bloggerized by Lasantha Bandara - Premiumbloggertemplates.com.

This is default featured slide 2 title

Go to Blogger edit html and find these sentences.Now replace these sentences with your own descriptions.This theme is Bloggerized by Lasantha Bandara - Premiumbloggertemplates.com.

This is default featured slide 3 title

Go to Blogger edit html and find these sentences.Now replace these sentences with your own descriptions.This theme is Bloggerized by Lasantha Bandara - Premiumbloggertemplates.com.

This is default featured slide 4 title

Go to Blogger edit html and find these sentences.Now replace these sentences with your own descriptions.This theme is Bloggerized by Lasantha Bandara - Premiumbloggertemplates.com.

This is default featured slide 5 title

Go to Blogger edit html and find these sentences.Now replace these sentences with your own descriptions.This theme is Bloggerized by Lasantha Bandara - Premiumbloggertemplates.com.

technologi

http://www.paid-to-promote.net/member/signup.php?r=miftahululum http://www.paid-to-promote.net/?r=miftahululum Get Paid To Promote, Get Paid To Popup, Get Paid Display Banner
Showing posts with label Cargo ship : oil tanker. Show all posts
Showing posts with label Cargo ship : oil tanker. Show all posts

Sunday, November 21, 2010

EnGiNe RooM

  ENGINE ROOM

Pictures of the technical jobs which keep the ship moving.

Helicopter view of the main- and auxiliary engines.
Piston 2 overhaul.
Exhaust valves of the B&W main engine.
View of the engine room.
FIAT B757S main engine, 9800 PK. Fitting new X-head bearings.
Fuel cam and reversing mechanism.
Cleaning the indicator cock before taking diagrams.
Carter inspection.
Sulzer RND68, cleaning the scavenge ports. Normally this is done through the scavenge system, here the cylinder cover insert was removed to change the gasket.
Measuring the cylinder liner. Diameter= 750 mm maximum allowable wear up to 756 mm.
The scavenge ports + piston rings.
Another kind of dirt in the filters, this is Lagos, Nigeria. The filter has to be cleaned every day. Normally it is checked once a month.
Cleaning the propeler during inwater survey at Caracas bay, Curacao
Fuel pump plunger. 6 cylinders are pumping 30 tons of fuel per day at 111 revolutions per minute.
View of the piston-underside. You see the piston rod, telescopic pipes of the piston cooling and behind the head some scavenge air valves.
This is a fuel pump roller and guide
Helsinki 25 december. Lots of work cleaning the filters
Fuel pump and hydraulic actuator of exhaust valve.
Main engine values during passage of the panama canal.
4de wtk bezig met de ketelwater test.

Thursday, November 18, 2010

Cargo ship : oil tanker

The "TENYO" for MINNOW MARITIMA S.A., one of the four new double hull VLCCs of the NIPPON YUSEN KAISHA (NYK LINE), was delivered on August 31, 2000 at the Nagasaki Shipyard & Machinery Works of Mitsubishi Heavy Industries, Ltd. (MHI)